Faire un don

Des accidents nucléaires partout

Etats-Unis : Browns Ferry : Arrêt d’urgence du réacteur causé par la turbine génératrice contre les surtensions de l’unité 1




26 août 2014


Lors de l’arrêt d’urgence, le système de confinement du réacteur par les vannes se serait effectué correctement, sauf pour le traitement des gaz de secours qui était en maintenance programmé. L’origine du signal de surtension est en cours de recherche.

Type : Fukushima I (BWR Mark I ) - Puissance : 3 458 MWth - Première divergence : 08/1973

Available in english only.


Event Number : 50404

Facility : BROWNS FERRY - State : AL

Unit : [1] RX Type : [1] GE-4

Event Date : 08/26/2014 - Event Time : 17:30

Emergency Class : NON EMERGENCY 10 CFR Section : 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION

Initial PWR : 95 % Current PWR : 0 %

Event Text

TURBINE GENERATOR NEUTRAL OVERVOLTAGE CAUSES A REACTOR SCRAM

"At 1730 CDT on August 26, 2014, Browns Ferry Unit 1 experienced a turbine trip resulting in an automatic reactor scram. The cause of the turbine trip was a control valve fast closure signal that was generated by a turbine trip on generator neutral over voltage signal. The Main Steam Isolation Valves (MSIVs) remained open with the main turbine bypass valves controlling reactor pressure. The Reactor Feedwater Pumps are in service to control reactor water level.

"Primary Containment Isolation Systems (PCIS) Groups 2, 3, 6, and 8 isolation signals were received. Upon receipt of these signals, all required components actuated as required with the exception of Standby Gas Treatment (SBGT) train A, which is under a clearance for planned maintenance. Neither High Pressure Coolant Injection (HPCI) nor Reactor Core Isolation Cooling (RCIC) initiation signals were received. Initially, three Main Steam Relief Valves (MSRVs) opened to control the pressure surge and subsequently reclosed.

"This event requires a 4 hour report per 10 CFR 50.72(b)(2)(iv)(B), ’Any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.’

"This event also requires an 8 hour report per 10 CFR 50.72(b)(3)(iv)(A), ’Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B), (1) Reactor protection system (RPS) including reactor scram or reactor trip, and (2) General containment Isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).’

"The NRC Resident Inspector has been notified.

"Service Request 926468 was initiated in the Corrective Action Program."

The plant is in its normal shutdown electrical lineup. The licensee is investigating the cause of the generator neutral overvoltage signal. There was no impact on units 2 and 3.

https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2014/20140827en.html#en50404


La surveillance des installations nucléaires au quotidien ? C’est grâce à vos dons que nous pouvons la mener !
Pour surveiller au jour le jour les incidents dans les installations nucléaires, les décrypter et dénoncer les risques permanents qui sont trop souvent minimisés - voire cachés par les exploitants, nous mobilisons tout au long de l’année des moyens humains et techniques.
Pour continuer ce travail de lanceur d’alerte et donner, au plus proche de leur survenue, des informations sur les inquiétants dysfonctionnements d’un parc nucléaire vieillissant, nous avons besoin de votre soutien financier !

Faire un don