Source : yle
https://yle.fi/uutiset/nuclear_watchdog_seeks_re-check_of_olkiluoto_3_reactor/7937448 Nuclear watchdog seeks re-check of Olkiluoto 3 reactor STUK does not expect the extra checks to slow down construction of the long-delayed Olkiluoto 3 unit.
18.4.2015 15:16 | updated 18.4.2015 15:16
The Finnish Radiation and Nuclear Safety Authority (STUK) is demanding that energy utility TVO carry out new tests of the durability of the pressure vessel planned for the (...)